TABLE C1

CONCRETE AIR CONTENT PRICE ADJUSTMENTS

Air Content Range

 

% Payment of Unit Price**

Minimum

 

Maximum

 

 

1.1*

and

below

 

0%

0.6

to

1.0

 

50%

0.1

to

0.5

 

75%

Low air tolerance limit

 

100%

 

Target

 

 

100%

High air tolerance limit

 

100%

0.1

to

0.5

 

98%

0.6

to

1.0

 

90%

1.1

to

1.5

 

80%

1.6

to

2.0

 

65%

2.1

to

3.0

 

50%

3.1

and

above

 

0%

 

*The Engineer may require concrete represented by air content more than 1.1% below the low air tolerance limit to be removed and replaced.

** Price adjustment is to be applied to the applicable contract line item, per unit of non-compliant concrete.  When the applicable contract line item includes substantial cost in addition to concrete material cost (such as structural concrete items which include substantial percentage of cost for formwork, falsework, labor and/or other non-material cost), the amount of price adjustment shall be based on the Engineer’s reasoned estimate of actual damage cost associated with the non-complying work, or the value indicated in this price adjustment schedule, whichever is less.

 

 

 

 

 

 

 

TABLE C2

WATER CEMENT RATIO PRICE ADJUSTMENTS

Water Cement Ratio Range*

 

% Payment of Unit Price

Minimum

 

Maximum

 

 

0.051

and

above

 

0%

0.031

to

0.050

 

50%

0.021

to

0.030

 

70%

0.011

to

0.020

 

80%

0.001

to

0.010

 

90%

-----

Limit

-----

 

 

 

* W/C deviation above the acceptable limits

 

 

 

 

 

 

 

TABLE C3

VIBRATOR FREQUENCY PRICE ADJUSTMENTS

Vibrator Frequency

 

% Payment of Unit Price

Minimum

 

Maximum

 

 

below 3500

 

 

 

90%

3500

to

3999*

 

95%

4000

to

8000

 

100%

8001

to

9000

 

90%

9001

to

10,000

 

75%

above 10,000

 

 

 

50%

 

* Engineer may extend the lower specification limit to include this range

Note: Price adjustment shall apply to area half the distance to the adjacent vibrator or edge of slab and the length traveled during the non-compliance

 

 

 

 

 

 

 

TABLE C4

CERTIFIED PLANT INSPECTION PRICE ADJUSTMENTS

Type of Work

 

Daily Price Adjustment

Structural Concrete & Patching

 

$500

Paving

 

$1,000

 

Note: Price adjustment in table is for failure to provide any certified plant inspection for placement/day. If a partial day is provided or if a portion of the testing is conducted, then the price adjustment should be prorated accordingly.  Plant monitoring is an agency responsibility.  Failure to provide plant monitoring could impact project funding but no price adjustment should be assessed.

 

 

 

 

 

 

 

TABLE C5

LATE CURING APPLICATION PRICE ADJUSTMENTS

Time After Finishing (hrs)

 

% Payment of Unit Price

½

to

<1

 

95%

1

to

<1½

 

80%

to

<2

 

65%

2

to

<3

 

50%

 

 

More than 3

 

40%